AQUA TREADMILL
READ ALL INSTRUCTION BEFORE USING
THIS OWNER’S MANUAL CONTAINS ASSEMBLY, OPERATION, MAINTENANCE AND SAFETY INFORMATION. IN THE INTERST OF SAFETY, PLEASE MAKE CERTAIN THAT YOU READ AND UNDERSTAND ALL THE INFORMATIONS BELOW.
IMPORTANT SAFETY PRECAUTIONS
SPECIAL RECOMMENDATIONS:
IMPORTANT:
DO NOT USE THE AQUA TREADMILL-OUT OF THE WATER.
THE USE OF THE AQUA TREADMILL FOR REHABILITATION PURPOSES IS ALLOWED ONLY IF SUPERVISED BY A SPECIALIST.
WARNING : Before commencing with any exercise program, please consult your family physician.
If at any time during exercise you feel faint, dizzy or experience pain, stop and consult your family physician. In the event any of the above mentioned warnings are breached by the consumer, the Manufacturer may use same as a defense to any claim for injuries, damage or loss. The above warnings are in no way intended to limit or modify the consumer’s remedies for breach of warranties pursuant to applicable Federal and State Laws of Regulations. They are being supplied strictly to ensure the safety of the individuals using the project.
2. BEFORE YOU BEGIN
IMPORTANT :Read all instruction carefully. Set-up the AQUA TREADMILL in accordance with the steps in the manual.
IMPORTANT : Layout all parts on the floor. Make sure you have all the parts listed below before beginning assembly. In case of a discrepancy, please do not return the AQUA TREADMILL to the store.
Where you purchased it, instead, call CUSTOMER SERVICE DEPARTMENT at the number listed below:
Tel () :+91-8178782671/9810101913
E-mail :wetfitindia@gmail.com
Website :www.wetfitaquagym.com
When ordering parts, please use the item number, part number and description listed in the PARTS LIST.
PRE-SET UP CHECK LIST
ITEM | DESCRIPTION | QUANTITY | REMARK |
1 | Base | 1 | |
2 | Treadmill Support | 1 | |
6 | The Front Roller | 1 | |
7 | The Rear Roller | 1 | |
8 | The Middle Roller | 1 | |
9 | The Treadmill Belt | 1 | |
10 | Hooves | 2 | |
11 | End Cap | 1 | |
12 | Nylon Sleeve 30 | 2 | |
13 | Nylon Sleeve 27 | 4 | |
14 | Plastic Layer | 2 | |
15 | Wheel | 2 | |
16 | Handle Bar Connector | 2 | |
17 | Pipe Clamp 32 | 4 | |
18 | Pin Shaft | 1 | |
19 | Spring | 1 | |
20 | Welded Nut | 1 | |
21 | Fastening Handle | 1 | |
22 | Hexagon Socket Head Cap Screws M21x65 | 2 | |
24 | Hexagon Socket Button Head Screws M8x45 | 2 | |
26 | Hexagon Socket Button Head Screws M6x50 | 2 | |
27 | Hexagon Socket Button Head Screws M6x40 | 12 | |
28 | Hexagon Socket Button Head Screws M6x70 | 2 | |
28 | Hexagon Socket Button Head Screws M6x10 | 2 | |
30 | Cross Slotted Head screw M5x14 | 4 | |
31 | Washer 12 | 2 | |
33 | Washer 8 | 2 | |
34 | Washer 6 | 18 | |
35 | Prevailing Torque Type Style Hexagon Nylon Nut M8 | 2 |
3. TOOLS:
WARNING : KEEP THE TOOL AWAY BABIES AND CHILDREN.
Fig. 1 Exploded – View Assembly Drawing
Note : Most parts are factory pre-assembled
PARTS LIST
PARTS LIST
ITEM No. | DESCRIPTION | QUANTITY | REMARK |
1 | Base | 1 | |
2 | Treadmill Support | 1 | |
3 | Handle Bar | 1 | |
4 | The Left Supporting Tube | 1 | |
5 | The Right Supporting Tube | 1 | |
6 | The Front Roller | 1 | |
7 | The Rear Roller | 1 | |
8 | The Middle Roller | 25 | |
9 | The Treadmill Belt | 1 | |
10 | Hooves | 2 | |
11 | End Cap | 1 | |
12 | Nylon Sleeve 32 | 2 | |
13 | Nylon Sleeve 27 | 4 | |
14 | Plastic Layer | 2 | |
15 | Wheel | 2 | |
16 | Handle Bar Connector | 2 | |
17 | Pipe Clamp 32 | 4 | |
18 | Pin Shaft | 1 | |
19 | Spring | 1 | |
20 | Welded Nut | 1 | |
21 | Fastening Handle | 1 | |
22 | Hexagon Socket Head Cap Screws M12x65 | 2 | |
23 | Hexagon Socket Button Head Screws M10x25 | 4 | |
24 | Hexagon Socket Button Head Screws M8x45 | 2 | |
25 | Hexagon Socket Button Head Screws M10x45 | 8 | |
26 | Hexagon Socket Button Head Screws M6x50 | 2 | |
27 | Hexagon Socket Button Head Screws M6x40 | 12 | |
28 | Hexagon Socket Button Head Screws M6x70 | 2 | |
28 | Hexagon Socket Button Head Screws M6x10 | 2 | |
30 | Cross Slotted Head Screw M5x14 | 4 | |
31 | Washer 12 | 2 | |
32 | Washer 10 | 4 | |
33 | Washer 8 | 10 | |
34 | Washer 6 | 18 | |
35 | Prevailing Torque Type Style Hexagon Nylon Nut M8 | 2 |
4. SETTING UP THE AQUA TREADMILL :
STEP 1 :
Slide the left supporting tube (4) and the right supporting tube (5) into the base (1), Fixed with four washer (32), Four hexagon socket head cap screws M10x25 (26).
Fig. 2 Fixing The Handle Bar
STEP 2 :
Slide the Handle bar (3) into the supporting tube (4) (5), Fixed with eight washer (33), Eight hexagon socket head cap screws M8x10 (25).
wetfit@gmail.com
www.wetfitaquagym.com
Reviews
There are no reviews yet.